clair-ridge-from-site-bp

Dillinger heavy plate for
the Clair Ridge platforms

Made 100% of Dillinger steel: Dillinger covered the overall need for heavy plates.

Clair Ridge is the second phase of the Clair Field development in the North Sea. The Clair field is located 75 km west of the Shetland Islands and extends over an area of 220 km2, in water depths of approximately 459 feet (140 m).

The second development phase involves the installation of two platforms linked by a 60 m long bridge: an eight-legged drilling and production platform and a four-legged quarter and utility platform. Clair Ridge, with estimated recoverable oil reserves of 640 million barrels over its 40-year lifespan, is expected to produce 120,000 b/d of crude oil beginning in 2017.

Innovative and environmentally friendly

Clair Ridge is the first sanctioned large-scale offshore enhanced oil recovery (EOR) scheme using reduced salinity water injection to extract a higher proportion of oil over the life of the field. With this new technology the operator expects to reach and extract significant oil reserves stocked further deep in the rocks far below the seabed, which are impossible to remove with conventional water-flooding techniques. Thus, 42 million additional barrels of oil should be collected.

Clair Ridge will be developed using the latest technology to reduce the environmental impact. The platforms will be powered by dual-fuel power generators, incorporating waste heat recovery technology.

As for the first Clair platform (supply of 22,000 t) Dillinger heavy plates play again an essential role in this innovative and challenging field development.

clair-ridge-dp-jacket-on-barge-kvaerner
clair-ridge-bp

Data

Operator
BP
Project partner
ConocoPhillips, Chevron, Shell
Installation
2017
Country
Scotland
Quality
S355J2+N, S355G10+M, S420G2+M, S460G1+M, S460G2+M, S500G2+M
Tonnage
39,200 t (jackets), 20,800 t (topsides)
Plate thickness (jackets)
8 - 115 mm
Plate thickness (topsides)
10 - 100 mm

Contact persons

20160404020936-federmeyer

Natalie Federmeyer
Sales Director
Wind Power & Construction

Phone: +49 6831 473449
Fax: +49 6831 47992685
E-Mail

20211118121155-graf

Tobias Graf
Strategy & Marketing,
Senior Manager Offshore Installations

Phone: +49 6831 473451
E-Mail