_6ub5222

Dillinger heavy plate for
arched bridges on the new tram line from Strasbourg to Kehl

Transcending boundaries

For the extension of Tram Line D from Strasbourg in France to Kehl in Germany, special steel from Dillinger plays an essential role.

This is because, in order to reach the river Rhine which marks the border, the tram route must cross the Vauban basin. This is achieved by travelling across the newly constructed Pont Citadelle, a 163 metre-long vaulted arch bridge with an arch that rises ornately 40 metres above the surface of the water. When it reaches the Rhine, the new tram crosses it via a 290 metre-long and 16 metre-wide double arched bridge with two arches, each 20 metres in height, until it arrives on the banks at Kehl. Like the Citadelle bridge, the tram bridge across the Rhine also offers space for pedestrians and cyclists.

For these two unique bridge structures, Dillinger supplied a total of around 3,500 tonnes of mainly higher-strength, thermomechanically rolled steel with plate thicknesses of up to 115 millimetres – and is thus playing a part in ensuring that the tram can henceforth travel from what is presently the end of the line at Aristide Briand to the station at Kehl.

_6ub5386
_6ub5430
_6ub5210
_6ub5500

Data

Installation
2017
Country
Germany/France
Quality
S460ML, S355K2+N, S460M, S355N, S355J2+N
Tonnage
3,500 t
Plate thickness
up to 115 mm

Contact persons

20160404020936-federmeyer

Natalie Federmeyer
Sales Director

Phone: +49 6831 473449
Fax: +49 6831 47992685
E-Mail

20221103095007-lehnert_2022

Dr. Tobias Lehnert
Marketing Dillinger Saarstahl, Head of Department Wind Power & Construction

Phone: +49 6831 472394
Fax: +49 6831 473089
E-Mail

20190918091643-tim-conde

Timm Condé
Senior Sales Manager, Steel Construction

Phone: +49 6831 472196
Fax: +49 6831 47992681
E-Mail