dsc_0022

Dillinger heavy plate for the
Haliç metro bridge

“A historic step forward”

In his speech at the opening ceremony, Turkey’s Prime Minister qualified the new Haliç metro bridge across the Golden Horn as “a historic step forward”. “Historic” is really the right appellation, when one considers that Leonardo da Vinci in 1502 already designed such a bridge over the Golden Horn!

A subway station on a cable stayed bridge: an unusual and innovative design

The Haliç bridge enables the extension of the M2 metro line beyond the Yenikapi terminus to Taksim Square, thus connecting the two parts of the European side of the city. It marks the latest step in a plan to expand railway transportation in Turkey’s largest city. The two new railway lines increase the transport capacity from 200,000 to around 750,000 passengers per day and offer an attractive alternative to car travel. Thus, they alleviate the traffic congestion and make a major contribution to reducing environmental pollution in the city.

A particular design feature of the 919 m long Haliç bridge is the interaction of various building structures. It consists of two access viaducts (169 and 241 m long), a steel cable bridge and a 122 m long swing bridge, rotating 90° around a vertical axis, to allow larger maritime traffic to pass through.

The 387 m long and 28.65 m wide cable stayed bridge comprises two 90 m long side spans and a 180 m long central span. It is carried by two 65 m high pylons and 176 stay cables. The most unusual design feature is the presence of a subway station in the middle of the bridge. Two 4.4 m wide pedestrian walkways are suspended underneath the box girder on both sides, giving access to the station platforms and facilitating the pedestrian transfer between the two sides of Golden Horn.

For this unusual and elegant structure work Dillinger delivered 14,540 t heavy plates (ASTM A36, ASTM A572-50, ASTM A709-345W, ASTM A709-HPS485W, S460NL, S690QL) in thicknesses of 20 to 150 mm.

Data

Architect
Hakan Kiran Architecture
Building owner
Istanbul Metropolitan Municipality
Engineer's society
Wiecon Consulting Engineers & Architects
Installation
15.02.2014
Country
Turkey
Quality
ASTM A36, ASTM A572-50, ASTM A709-345W, ASTM A709-HPS485W, S460NL, S690QL
Length
919 m
Tonnage
14,540 t
Plate thickness
20 - 150 mm

Contact persons

20160404020936-federmeyer

Natalie Federmeyer
Sales Director

Phone: +49 6831 473449
Fax: +49 6831 47992685
E-Mail

20221103095007-lehnert_2022

Dr. Tobias Lehnert
Marketing Dillinger Saarstahl, Head of Department Wind Power & Construction

Phone: +49 6831 472394
Fax: +49 6831 473089
E-Mail

20190918091643-tim-conde

Timm Condé
Senior Sales Manager, Steel Construction

Phone: +49 6831 472196
Fax: +49 6831 47992681
E-Mail