Dillinger heavy plate for the
Patton Bridge in Luxembourg
Built from weathering steel of course
Near the memorial in honor of General Patton, the bridge over the Sûre, which had existed since 1951, was demolished and replaced by a new steel bridge on steel piers. The new bridge is 177 m long, 17 m wide and partly straight and partly curved in plan view. As part of the “Multimodal Transport Hub at Ettelbruck Station” project, the reconstruction of the Patton Bridge will allow buses to be prioritized, an adequate loading gauge for soft mobility, but also the possibility of increasing the railroad loading gauge to comply with the new CFL standards. The bridge is composed of two lanes, a service lane, a pedestrian and bicycle lane, and a dedicated bus lane.
A construction site with many challenges
- Maintaining two-way traffic – Complex and special phases to ensure traffic in both directions on a permanent basis,
- Strict deadlines in case of train traffic interruptions,
- Natural integration into the landscape – for this reason, the new bridge was built of weathering steel.
For this bridge with a renowned name, Dillinger supplied approx. 1,210 t of heavy plate in grade S355J2W+N in thicknesses from 8 to 40 mm.
Data
Contact persons
Natalie Federmeyer
Sales Director
Wind Power & Construction
Phone: +49 6831 473449
Fax: +49 6831 47992685
E-Mail
Dr. Tobias Lehnert
Head of Marketing & Technical Support, Wind Power & Construction
Phone: +49 6831 472394
Fax: +49 6831 473089
E-Mail
Timm Condé
Senior Sales Manager, Steel Construction
Phone: +49 6831 472196
Fax: +49 6831 47992681
E-Mail