pont-66460606469c3657008788-1

Dillinger heavy plate for the
Pleyel bridge in Paris

Weathering-resistant steel from Dillinger at the Olympic Games in Paris

The Pleyel bridge in Saint-Denis in Paris is more than just a functional link. The infrastructure project stands as a major global, ambitious and innovative project, which will have a decisive impact on the urban development.

The construction of the bridge will create public space in the centre of the city. One bus lane, two general-purpose traffic lanes, two cycle lanes and vast pedestrian areas – the Pleyel bridge offers many possibilities for usage.

The bridge will also play a key role for the Olympic Games 2024, as it will primarily ensure the access to the Olympic sites. The bridge links the athletes’ village in the west, the Stade de France stadium as well as the Olympic aquatic centre in the east. The structure also spans several railway tracks of the third largest rail yard in the world, Paris Nord.

With a total length of 300 m and an average width of 28 to 42 m, this structure has huge dimensions. If the access ramps at both ends are considered, there is an impressive total length of 700 m.

The final completion of the bridge is scheduled for 2026. However, the first section of this breathtaking bridge was inaugurated and put into operation this year. This is an important pedestrian bridge for the realisation of the Olympic Games.

Dillinger delivered approximately 940 t weathering-resistant steel plates of steel grade S460K2W+M in plate thicknesses of 18 – 80 mm. True to the Olympic spirit – being there is everything – Dillinger steel was therefore also part of the 2024 Olympic Games in Paris.

1719413765307
1719413764277
1719413763981

Data

Installation
Pedestrian bridge in March 2024
Country
France
Quality
S460K2W+M
Tonnage
940 t
Plate thickness
18 - 80 mm

Contact persons

20160404020936-federmeyer

Natalie Federmeyer
Sales Director

Phone: +49 6831 473449
Fax: +49 6831 47992685
E-Mail

20221103095007-lehnert_2022

Dr. Tobias Lehnert
Marketing Dillinger Saarstahl, Head of Department Wind Power & Construction

Phone: +49 6831 472394
Fax: +49 6831 473089
E-Mail

20190918091643-tim-conde

Timm Condé
Senior Sales Manager, Steel Construction

Phone: +49 6831 472196
Fax: +49 6831 47992681
E-Mail